Stormwater Management and I&I Prevention

Stormwater Management and I&I Prevention
Epoxy and PVC adhesive used in transition between T-Lock and concrete manhole

HDPE pipe solves swamp problem for airport expansion

Problem: Building the 3,300-foot-long, east-west runway at Grand Forks International Airport in North Dakota required that swampland around it be properly drained because it could not support any load.

Solution: Ulteig Engineers designed the drainage system using 18- to 60-inch-diameter pipe connected in a herringbone pattern in cover ranging from 4 to 5 feet. More than 3.5 miles of MEGA GREEN corrugated...

Please login or register to view I&I articles. It's free, fast and easy!


Discussion

Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.